The Vermeer PD5 pile driver was recently used on a solar energy installation on a farm outside of Perth. On a cold and wet day, with challenging conditions, the PD5 got the job done – quickly and with little effort. See it in action and check out some of its many features.

PD5 Solar Pile Driver Installation

Farmers across Australia are investing in solar energy to reduce energy costs and greenhouse emissions.  Solar energy contractors are now using solar pile drivers, like the Vermeer PD5, to accurately drive posts into the ground in a matter of minutes – as opposed to the traditional method of digging a hole and filling it with concrete. This not only makes the operation easier; it also creates a cleaner end result.

To find out more about our range of solar pile drivers, speak to one of our team members on (08) 9479 4994.

 

 

 

Related posts
Vermeer SC30TX vs Toro STX-26 Stump Grinder
How to Choose the Best Tree Climbing Gear
The Benefits of Using HDD in Pipeline Construction